US 60 daytime lane closures near the Pinto Creek Bridge scheduled June 2

Pinto Creek Bridge - Contributed Photo/ADOT

Motorists on US 60 between Miami and Superior will encounter lane closures and delays Wednesday, June 2, for the Pinto Creek Bridge replacement project.

Alternating lane closures with flaggers are scheduled from 5:30 a.m. to 5 p.m.

While delays will generally be limited to 15 minutes, longer delays are possible during peak travel times. 

Motorists should proceed with caution, slow down, watch for equipment, and follow the directions of flaggers and law enforcement.

More information about the project is available at azdot.gov/PintoCreekBridge.

Schedules are subject to change based on weather and other unforeseen factors. For more information, please call the ADOT Bilingual Project Information Line at 855.712.8530 or go to azdot.gov/contact and select Projects from the drop-down menu. For real-time highway conditions statewide, visit ADOT’s Traveler Information Site at www.az511.gov, follow ADOT on Twitter (@ArizonaDOT) or call 511, except while driving.

Comments

comments